This was a multi-state, multi-plant move that ran throughout the course of many months.
Part of the project consisted of a custom build press that came assembled in several loads (seen in the photos).
The relocation also consisted of moving polishing equipment, seemers and speciality equipment for tanker trailers.
Project Information
Over the course of a summer, Big Red moved several pieces of machinery to different locations in WI and IL. The most complex part of this project was the unloading and assembly of a custom press. We utilized our 600 Ton gantries, 100 Ton trailer, 23/35 Versa Lift, Manlifts and Hyster through the duration of this project. And of course, we brought along our Master Riggers to operate, rig, and assemble this equipment. With 7 truckloads, we got all the equipment we needed on the job site … which actually isn’t uncommon for large presses.